Butterfly Plaza
Butterfly Plaza

Butterfly Plaza
 
 
The enhancement of Butterfly Plaza was completed in the first quarter of 2010. In keeping with the name of the plaza, abstract visual treatments of butterflies and leaves were adopted as the main design theme for this renovation project. Vertical circulation within the Plaza was also significantly improved by replacing the original staircases with new escalators. The floor layout was reconfigured by re-partitioning the existing Chinese restaurant and supermarket as part of the enhanced trade mix of the plaza. In addition to a face-lift of the common areas, a spacious central atrium with new skylight was created as the focal point of the plaza to improve its image and ambience.
 
Before AEI After AEI
Main Entrance Main Entrance Before AEI Main Entrance After AEI
​ Main Entrance
Entrance Corridor After AEI Entrance Corridor
Atrium Atrium Before AEI ​Atrium and Promotion Venue After AEI Atrium and Promotion Venue       
​Arcade Arcade Before AEI
 ​Arcade with New Escalators After AEI Arcade with New  Escalators
Arcade After AEI Arcade
 
DJSI Asia Pacific FTSE4Good Caring Company 2007-12 Hong Kong Top Service Brand w3c wcag 2.0 w3c xhtml 1.0 Web Accessibility Recognition Scheme